Filling the gap left by a missing planner

With no planner on the team, I wrote 17 requirements documents myself, worked directly with the client, and split work across teams

Role
Backend development · Requirements · Functional spec
Period
2026.01 – 2026.02
Type
Samsung C&T · Building stack effect monitoring system · Planning and development
Team
Planning 1 (me, covering for the missing planner) · Development 4 (incl. me) · Design 1
00 Overview

Bottom line

  • From planning to development
  • Defining client problems
  • Requirements definition
  • Functional spec
  • Cross-team communication
Bottom line

Even without a planner, the team started development on the same standard I carried it from requirements through backend implementation and EC2 deployment

  • 17Requirements documents I wrote myself
  • 9Document versions reflecting client feedback in one month
  • 1st releaseBackend built and deployed to AWS EC2

While I was on the backend of Samsung C&T’s building stack effect monitoring system, the planner left the project. I wrote 17 requirements documents and the functional spec myself, and carried those criteria through backend implementation and deployment.

PROCESS
  1. Stack effect domain study
  2. Client / expert advisory meetings
  3. Requirements definition
  4. Functional spec
  5. API / DB design
  6. Backend implementation
  7. EC2 deployment
01 Background

An unfamiliar domain, and no development baseline

While I was on the backend of a stack effect monitoring system, the planner moved to another project

It was a web system that collects sensor data on the stack effect — air flowing up and down a high-rise because of the indoor/outdoor temperature difference — and provides real-time monitoring, history lookup and risk alerts.

While I was preparing to start the backend, the planner moved to another project, leaving us without the requirements and feature definitions needed to start development. The stack effect itself was a new domain for everyone on the team.

02 Problem

Without a standard, the same feature gets built differently

We couldn’t start development with requirements, data and decision criteria all undefined

What was missing before we started
  1. Requirements · feature scopeClient requests piled up meeting after meeting, undocumented
  2. Data to support predictionNo history of past stack effect events
  3. Criteria for sensor healthAbout 100 sensors, no rule for failure · missing data
  4. Front-end · back-end boundariesUndecided who calculates and shows what
  5. Communication with the sensor vendorData discussions weren’t going smoothly

→ With no development baseline, each teammate read things differently

Why it matters

Without a standard, each teammate builds the same feature differently. When requests pile up undocumented, no one can tell what is confirmed, and fixing things after implementation gets expensive.

'Prediction' and 'alerts' in particular were features we couldn’t promise the client without supporting data and decision criteria.

03 Solution

Redefining scope to what we could build

Instead of passing requests through, I turned them into criteria we could implement with the data and conditions we had

I attended client meetings in person, wrote the minutes in a unified format, and requested an expert advisory meeting and summarized the results. Through those meetings I first learned how the stack effect works and when it becomes risky, then defined the requirements myself. The key was redefining scope as criteria we could verify under the given conditions.

Thought process
  1. Observation

    Client requests only described the outcome — 'predict it', 'alert us' — and left out what to base decisions on.

  2. Question

    With the data and conditions we have now, what criteria can we actually verify?

  3. Decision

    Don’t pass requests through as they are. Redefine them within what we can build and verify, and agree on it in writing with the client and the team.

  1. Solution 1Stack effect prediction
    Before
    Predict stack effect events and tell us
    Insight
    • With no history of past events, learning-based prediction had no basis
    • Indoor and outdoor temperatures could be collected in real time
    After
    • Based on the difference between average indoor and outdoor temperature
    • Rescoped to a 3-level (low · medium · high) prediction
  2. Solution 2Sensor status
    Before
    Monitor sensor status
    Insight
    Without a definition of 'normal', failures and gaps across about 100 sensors can’t be judged
    After
    • Offline if no data for 1 minute
    • Defined receive success rate · DB load success rate metrics
  3. Solution 3Risk alerts
    Before
    Alert us when it’s risky
    Insight
    If the same risk triggers alerts over and over, operators stop trusting them
    After
    • 3-level thresholds set by admins
    • Ongoing events aren’t duplicated and close when back to normal
04 Action

From criteria to documents, then to code

I carried it myself from requirements to backend implementation and deployment

Requirements and functional spec

I wrote 17 requirements documents and the functional spec, and added a sheet splitting backend and frontend responsibilities. I updated the documents with every round of client feedback, managing 9 versions in one month, and wrote cross-team technical meeting notes to pin down what the dashboard needed (floor-by-floor pressure-difference heatmap, sensor status and more).

Designing data and decision criteria

  1. CollectRaw sensor loadingPLC loads directly into RDS (deduplicated by zone · device · measured time)
  2. RefineRaw table + composite indexIndex on (zone · category · device · measured time DESC) to query each device’s latest value without a separate table
  3. JudgeStatus · outliers · stack effect eventsOffline check · Z-Score · 3-level thresholds
  4. DeliverAlerts · dashboard API4 alert types by stack effect pattern · history · export

Backend implementation · deployment

As the backend developer, I implemented the criteria I had defined. I built Z-Score-based sensor outlier detection, 4 alert types by stack effect pattern, and JWT authentication (after reviewing and applying refresh tokens in cookies), then deployed to AWS EC2.

Screen design

I worked with the designer on how the criteria would appear on screen. The overview brings the floor-by-floor pressure-difference heatmap, sensor status and prediction alerts together on one screen.

Overview — pressure difference by floor · sensor status · stack effect prediction alerts

Sequence diagrams

For each feature, I mapped the call order among sensors, the weather API, the server and the DB as sequence diagrams, aligning data flow and exception handling with the team before implementation.

Tech and deliverables

Backend
  • Spring Boot
  • PostgreSQL (AWS RDS)

Added a composite index to the raw sensor table (pi_data) that the PLC loads directly into RDS, so latest values are queried without a separate table, and implemented Z-Score outlier detection and 4 alert types by stack effect pattern.

Auth
  • JWT
  • Refresh Token (Cookie)

Reviewed handling refresh tokens in cookies, then applied it.

Infra
  • AWS EC2
  • Nginx

Finished the first backend release and deployed it to EC2.

Docs
  • 17 requirements documents
  • Functional spec
  • Sequence diagrams
  • Technical meeting notes

Updated documents with every round of client feedback, managing 9 versions in one month.

05 Result

The team started development on the same standard

The documents became the baseline for development, and the criteria I defined worked as real features

17

Requirements documents I wrote myself

9

Versions reflecting client feedback (one month)

100

Sensors with defined status criteria (approx.)

  • Even without a planner, the team developed against the same documents.
  • I set criteria that let operators see sensor failures and missing data right on screen.
  • I finished the first backend release and deployed it to EC2.
  • I kept meeting notes and organized proposals, leaving a record of what the client and the team agreed on.
06 Learning

Deciding what to build sets the pace

  • Lesson 1

    Criteria come first

    Before development starts, deciding what to build and by what criteria shapes the whole team’s speed and direction.

  • Lesson 2

    The cost of ambiguity, seen from both sides

    Implementing the criteria I had defined myself showed me what ambiguity at the planning stage costs in development. That experience is where I chose to move into service planning.